67Topographical survey for Existing Water Lifting Station, at Kolkata ,W.B.CMDALarsen & Trobro LimitedLarsen & Trobro LimitedTen different Location Total Lump Sum- Rs:- 0.3 Lakh.
66Topographical survey for Existing Bus Stand, at Rajarhat, Kolkata ,W.B.HIDCOKSAB.KSAB.Three different Location Total Lump Sum- Rs:- 0.4 Lakh.
65Engineering Survey Works For Construction of Steel plate Rolling mill, Salop, Howrah, WB.SHYAM STELL LIMITED.MOON Builders.MOON Builders.Survey Team Rs:- 50,000.00/ Month, Total Rs: - 06.00 Lakh.
64Survey Instruments in Hire basis For Construction Work at Tikri, Raigada Odisha.AAPL.Larsen & Trobro Limited.Larsen & Trobro Limited.Survey Instrument Rs:- 44,000.00/ Month, Total Rs: - 07.92 Lakh.
63Engineering Survey Team For Construction Work of Sewerage line, Saidpur, Patna, Bihar.PDA.Larsen & Trobro Limited.Larsen & Trobro Limited.Survey Team Rs:- 21,500.00/ Month, Total Rs: - 01.93 Lakh.
62Engineering Survey For Construction Work of Sewerage line, Amravati, Hyderabad, A.PAPCRDA.APCRDA.Larsen & Trobro Limited.Survey Team Rs:- 58,500.00/ Month, Total Rs: - 10.53 Lakh.
61Engineering Survey For Under ground pipe line Works at Vijaywada, A.PAGCAGCLarsen & Trobro Limited.Survey Team Rs:- 65,000.00/ Month, Total Rs: - 13.72 Lakh.
60Engineering Survey For As build data and drawing Work at Integrated Sewerage line, Pali, Rajasthan .JDA.JDA.Larsen & Trobro Limited.Survey Team Rs:- 65,000.00/ Month, Total Rs: - 7.20 Lakh.
59Engineering Survey For Under ground pipe line and STP Works at Naya Raipur, Chhattisgarh.UGDS / NRDA.Larsen & Trobro Limited.Larsen & Trobro Limited.Survey Team Rs:- 1,20,00/ Month, Total Rs: - 40.40 Lakh.
58Town road detailing survey with all features and Drainage system at NMDC Iron & steel Plant, Nagarnar, Jagadalpur, Chattisgarh- 494 001Storm Water Drain ProjectLarsen & Trobro Limited.Larsen & Trobro Limited.Survey Team Rs :- 45,000.00/-Month, Total Rs – 2.80 Lakh.
57Town road detailing survey with all features and Drainage system at Barrackpore , 24 pgs- (N)W.B.Barrackpore,Sewerage Network & WWT project.Larsen & Trobro Limited.Larsen & Trobro Limited.Length—136 km. Lump Sum Rs – 6.8 Lakh.
56Town road detailing survey with all features and Drainage system at NMDC Iron & steel Plant, Nagarnar, Jagadalpur, Chattisgarh- 494 001Storm Water Drain ProjectLarsen & Trobro Limited.Larsen & Trobro Limited.Length—440 km. Lump Sum Rs – 22 Lakh.
55Detailing survey with all features and Drainage system at Bhatpara city, 24 pgs 0-(N) ,W.B.Bhatpara Sewerage Network & WWT project.Bhatpara Sewerage Network & WWT project.RMK Associates.Length—55 km. Lump Sum Rs – 3.2 Lakh.
54Town road detailing survey with all features and Drainage system at Bhatpara , 24 pgs- (N)W.B.Bhatpara Sewerage Network & WWT project.Bhatpara Sewerage Network & WWT project.Larsen & Trobro Limited.Survey Team Rs:- 45,00.00/ Month, Total Rs: - 2.80 Lakh.
53Engineering Survey For Development Work of naya Raipur at Raipur Chhattisgarh.NRDA.NRDA.Larsen & Trobro Limited.Survey Team Rs:- 1,20,000.00/ Month, Total Rs: - 7.20 Lakh.
52Engineering Survey For Development Works of Kamal Vihar at Raipur , Chhattisgarh.RDA.Larsen & Trobro Limited.Survey Team Rs:- 70,000.00/ Month, Total Rs: -13.30 Lakh.Completed on December 13.
51Engineering Survey For Iron and Pellet handling system at Jamshedpur, Jharkhand.TISCO.Larsen & Trobro Limited. .ECC Division.Survey Team Rs:- 70,000.00/ Month, Total Rs: -18.20 Lakh.Completed on July 12.
50Engineering Survey For CHP Tiroda , Thermal Power project at Gondia Maharastra.ADANI POWER PROJECT.Larsen & Trobro Limited. .ECC Division.Survey Team Rs:- 65,660.00/ Month, Total Rs: -15.76 Lakh.Completed on July 14.
49Engineering Survey for CAN MILL project at Hirakud , Sambalpur, Orissa.CAN MILLLarsen & Trobro Limited. .ECC Division.Survey Team Rs:- 82,500.00/ Month, Total Rs: -14.85 Lakh.Completed on July 12.
48Engineering Survey For Alumina Silo & Casthouse project at AAP, Lapanga, Orissa.AAP.Larsen & Trobro Limited. .ECC Division.Survey Team Rs:- 71,000.00/ Month, Total Rs: -20.59 Lakh.Completed on MAY 13.
47Engneering Survey For Steel Plant Project at Bhilai.BSP.Larsen & Trobro Limited.Survey Team Rs:- 41,000.00/ Month, Total Rs: - 1.64 Lakh.Completed on March 11.
46Enginering Survey For Steel Plant Project Phase-II at NTPC Barh, Bihar.NTPC.Larsen & Trobro Limited. .ECC Division.Survey Team Rs:- 72,000.00/ Month, Total Rs: - 25.92 Lakh.Completed on December 13.
45Engineering Survey For Storm water Drainage & Reservoir project at IOCL Paradip , Orissa.IOCL.Larsen & Trobro Limited. ECC Division.Survey Team Rs:- 1,04,800/ Month, Total Rs: - 37.73 Lakh.Completed on September 13.
44Engineering Survey for Civil works project at Korba, Chattishgarh.BALCOLarsen & Trobro Limited. .ECC Division.Survey Team Rs:- 93,000.00/ month, Total Rs: - 11.16 Lakh.Completed on February 13.
43Structual Survey for Canopy erection bolt and column center at Bhopal ,M.P.D.B. Malls Pvt: Ltd.D.B. Malls Pvt: Ltd.Survey Team Rs:- 5000/ Day, Total Rs: - 0.55 Lakh.Completed on December 09.
42Topographical survey for proposed 33 K.V. Sub Station at Rajarhat, Kolkata ,W.B.W.B.S.E.D.C.LGeotreat.Area 06 Hectos Total Lump Sum- Rs:- 0.2 Lakh.Completed on November 09.
41Structural Survey for Canopy Erection bolt and column center at Bhopal, M.P..D.B. Malls Pvt: Ltd.D.B. Malls Pvt: Ltd.Survey Team Rs:- 5000/ Day, Total Rs: -0.45 Lakh.Completed on August 09.
40Engineeering Survey for Civil works project at Gondia , Maharashtra.Adani Power Maharashtra Ltd.Gammon India Ltd.Survey Team Rs:- 70,000.00/ Month, Total Rs: -2.10 Lakh.Completed on September 09.
39Topographical survey for proposed Metro Rail Station at Kolkata,W.B.Kolkata Metro Rail Corporation Ltd.Kolkata Metro Rail Corporation Ltd.Area 06 Hectors Total Lump Sum- Rs:- 0.65 Lakh.Completed on June 09.
38Topographical Survey For Construction Area and layout of Proposed Pipe Line at Lanjigarh ,Orissa.Utkal Alumina International Ltd.Larsen & Trobro Limited. ECC Division.Area 40 Hectors & Pipe line 12.5 k.m. Total Sum- Rs: - 3.50 Lakh.Completed on December 09.
37Layout of Tunnel Guard wall and Engineering survey at Haldia ,W.B.H.M.C.P.C.LLarsen & Trobro Limited. .ECC Division.Survey Team Rs:- 70,000.00/ Month, Total Rs: - 7.00 Lakh.Completed on January 10.
36aTopographical Survey For Construction area and layout of Haldia city centre.Ambuja Realty Development Ltd.Ambuja Realty Development Ltd.Lump Sum Rs:- 0.25 Lakh.Completed on January 09.
36Topographical Survey For Construction area and layout of canal center multi car parking area at City Center -2 in Kolkata, W.B.Ambuja Realty Development Ltd.Ambuja Realty Development Ltd.Lump Sum Rs:- 0.275 Lakh.Completed on February 09.
35Topographical Survey For Construction Area and layout base pillar pile point etc, at Lanjigarh ,Orissa.Vedanta Aluminum Ltd.Larsen & Trobro Limited. .ECC Division.Survey Team Rs:- 69,000.00/ month, Total Rs: - 8.28 Lakh.Completed on December 09.
34Structual Survey for Canopy erection bolt and column center at City Center in Kolkata, W.B.Ambuja Realty Development Ltd.Sood Technicians (pvt) Ltd.Survey Team Rs:- 5000/ Day, Total Rs: - 0.75 Lakh.Completed on January 09.
33Layout of Waste Water Reservoir at Jharsughda , Orissa.SPECOSinhotia Metals Minarals (p) Ltd.Lump Sum Rs:- 0.50 Lakh.Completed on December 08.
32Topographical survey for Kolkata Book Fair at Milon mela maidan , Saltlake, W.B.Gilt.Citius consultant.Lump Sum Rs:- 0.20 Lakh.Completed on December 08.
31Engineeering Survey in Mechanical site (Blast Furnace) at Vishakhapatnam ,A.P.Vishakhapatnam Steel Plant.Larsen & Trobro Limited. .ECC Division.Survey Team Rs:- 38,000.00/ Month, Total Rs: - 3.80 Lakh.Completed on November 09.
30Topographical survey for City Center at Haldia ,W.B.Haldia Development Authority.Ambuja Realty Development Ltd.Lump Sum Rs:- 0.15 Lakh.Completed on October 08.
29Mechanical Erection , layout and Engineering survey at Angul , Sambalpur, Orissa.Bhushan Steel (pvt) Ltd.Larsen & Trobro Limited. .ECC Division.Survey Team Rs:- 34,000.00/ Month, Total Rs: - 8.16 Lakh.Completed on December 09.
28Grid Contour ,Pre-Post Level and volume calculation for earth work at Bilaspur , C.G.Calro Ltd.Consolidated Construction Consortium Ltd.Lump Sum—Rs:- 0.12 Lakh.Completed on May 08.
27Topographical Survey For CHP Area and layout base pillar ,B.H Point at Kodarma ,Jharkhand.D.V.CLarsen & Trobro Limited. .ECC Division.Lump Sum Rs:- 1.75 Lakh.Completed on May 08.
26Topographical survey for proposed Falta police station at 24 pgs: W.B.P.W.DGeotreat.Lump Sum Rs :-0.25 Lakh.Completed on April 08.
25Mechanical Erection layout survey at Tata , Jharkhand.Tata Steel Ltd.Gillanders Arbuthnot & Co Ltd. Unit- MICCO.Survey Team ---Rs:- 50,000.00/month, ,Total Rs:- 4.50 Lakh.Completed on July 08.
24Layout survey for Seamless Tube Plant at Tata,Jharkhand.Zoom Ballav Steel(p) Ltd.Geotreat.Lump Sum Rs :-0.25 Lakh.Completed on April 08.
23Topographical Survey for proposed RMX Plant at Chamrail, Mahestala at Kolkata.ACC Cement Ltd.Geotreat.Lump Sum Rs :-0.30 Lakh.Completed on April 08.
22Layout of Bore hole and pier point at Bokaro Steel Plant, Jharkhand.Bokaro Steel Plant.Larsen & Trobro Limited .ECC .Lump Sum Rs :-0.65 Lakh.Completed on March 08.
21N.H Center line marking and C.S taking for volume calculation at Aizwal, Mizoram.B.R.T.FTantia Construction Ltd.Survey Team ---Rs:- 96,000.00/month, ,Total Rs:- 3.84 Lakh.Completed on August 08.
20Proposed Blast Furnace area Topographical Survey at Angul, Orissa.Bhusan Steel (Pvt) Ltd.Larsen & Trobro Limited. .ECC.Area—56 Hectors @. Rs: - 1400.00/Hector, Total Rs:- 0.85 Lakh.Completed on January 08.
19Proposed Plant area Topographical Survey With layout and long section of conveyor line at Maithon , Jharkhand.Miathon Power Ltd.Larsen & Trobro Limited. .ECC.Area—60 Hectors. Rs: - 1400.00/Hector, and 1.5 km Conveyor line Rs 15000.00/km Total Rs:- 1.06 Lakh.Completed on December 07.
18R.O.W pillar and C.L checking as per design co-ordinates at 2nd Hooghly bridge at Kolkata.N.H.A.IRoad Star (India) Infrastructure private Limited.Survey Team Rs:- 5000.00/day Total:- Rs: 1.50 Lakh.Completed on January 08.
17Topographical survey and Grid contour for proposed substation area at Bokaro, Jharkhand.S.P.M.LGeotreat.For Sub Station Area Lump Sum :- 0.80 Lakh .Completed on October 07.
16Check Survey for 400 KV D/C Akhola – Ouranghabad Transmission Line at Maharashtra.Power Grid Corporation (I) Limited.Multi- Fab.Team monthly basis for 03 months. Total Rs:- 1.86 Lakh.Completed on December 07.
15Route Alignment and topographical survey of Pipe line in Murshidabad central sector, W.B.W.B.I.D.C.L.Larsen & Trobro Limited .ECC Division – EDRC.Length—154.00 Km .Rs:- 4500.00 ,Total Rs:- 6.93 Lakh.Completed on August 07.
14Route Alingnment and topographical survey of Pipe line proj: from Sirampore to Singur in W.B. for Tata Motors Limited.W.B.I.D.C.L.Larsen & Trobro Limited .ECC Division – EDRC.Length—22.00 Km .Rs:- 5500.00 ,Total Rs:- 1.21 Lakh.Completed on July 07.
13Check Survey for 765 KV S/C Meward – Wardha Transmission Line at Maharashtra.Power Grid Corporation (I) Limited.Associated Transrail Structures LimitedLength—75.00 Km .Rs:- 4000.00 ,Total Rs:- 3.0Lakh.Completed on April 07.
12Route Alignment and Details survey of Ambikapur- Pathalgoan 132 K.V. D/C Transmission line at Chattishgarh.Chattishgarh State Electricity Board.Jyoti Structures Limited.Length—95.00 Km. Rs:- 6200.00 ,Total Rs:- 5.89 Lakh.Completed on April 07.
11Plant Topographical Survey with layout of conveyor line Building and internal road etc, at Kahalgaon , Bihar.National Thermal Power Corp: Ltd.Geotreat.Area—25 Hectors. Total Rs: - 1.0 Lakh.Completed on January 07.
10Topographical survey and all electrical details survey for junction signaling at shilling town at Meghalaya.Webel Mediatronics LimitedPacific Engineers.Junction 16 nos: Lump Sum Total Rs:- 1.5 Lakh.Completed on February 07.
09Railway Level Crossing- (Over Bridge) Center line fixing, Pile cap Pier point layout as per design co- ordinate at Darbangha, Bihar.Indian Railways.Stup Consultants (P) Ltd.Length—1.3 Km. Lump Sum Rs :- 1.5 Lakh.Completed on December 07.
08Bridge layout , Topographical and Pier fixing with Utility & Land Acquisition Plan at Patna Bihar.P.W.D Bihar.Ircon International Limited.Length—2.5 Km. Total Rs:- 1.84 Lakh.Completed on January 07.
07DPR Survey for river and canal crossing of Samastipur - Dharbangha S.H (Bihar).Larsen & Toubro.Gherzi Eastern Ltd.Major Bridges 03 & Minor Bridges 06. Total Rs:- 0.8 Lakh.Completed on September 06.
06DPR Survey for river and canal crossing of Ara-Sasaram N.H.-30 (Bihar).National Highway Authority Of India.Stup Consultants (P) Ltd.Major Bridges 04 & Minor Bridges 22. Total Rs:- 1.25 Lakh.Completed on October 06.
05Plant Topographical Survey with layout of conveyor line and Building, interval road etc at Barh Bihar.National Thermal Power Corporation Ltd.Geotreat.Area—75 Acres. Lump Sum Rs:- 0.85 Lakh.Completed on October 06.
04Town road detailing survey with all features and Drainage system at Kolkata W.B.Kolkata Municipal Corporation.Tantia Construction Co Ltd.Length—1.2 Km. Lump Sum Rs:- 0.6 Lakh.Completed on September 06.
03Topographical survey & Contour Mapping 0.5 mt interval and Base pillar fixing for Construction work at Darjilling W.B.West Bengal State Tourism Development Corporation.Earth Remedies (p) Ltd.Area—60 Hectors. Total Rs: - 1.8 Lakh.Completed on July 06.
02Slum Survey of ward basis at Rishra Hooghly W.B.Kolkata Metropaliton Development Authority.Rishra Municipality.Ward area basis Lump Sum—Rs:- 0.75 Lakh.Completed on April 06.
01Layout of factory as per plans, pier point marking ,Mechanical alignment and Conveyor line fixing etc, at khargapur, W.B.Rashmi Metallic (P) Ltd.Rashmi Metallic (P) Ltd.Team monthly Basis for 12 months, Total Rs:- 7.2 Lakh.Completed on September 07.